Sand the boards step 5.
Fixing wood flooring to concrete.
Concrete must be a minimum of 30 days old.
Always use a moisture bearer which is usually placed between the subfloor and the finished floor.
Nail boards into place step 4.
Blow the residual dust out of the concrete hole using a vacuum or syringe blower.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
Sign up now for tim s free weekly newsletter at.
Treated plywood to the concrete with concrete screws spaced every 16 in.
Remove damaged pieces of flooring step 2.
That s the way h w floors are.
Mark the holes in the concrete and wood using a permanent marker first to make sure your holes are precise.
Solid parquet should not be installed below grade.
After 3 attempts and 5 months to fix numerous creaks in the floor the installer is now claiming.
We had a h w floor installed by the builder on concrete slab.
Drill completely through the wood and about 1 4 inch 0 64 cm deeper than the screw s length into the concrete.
How to repair hardwood flooring step 1.
Fortunately there are many ways to make the transition from concrete floors and wall frames to wood floors and drywall.
Concrete is not the easiest material to work with especially if you re trying to build a structure like a house that involves the use of both concrete and wood products.
The surface of the concrete must be flat and free of oil grease and dust.
Put vapor barrier in place step 3.
Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
I have my doubts on this and would like to figure out what the expectation for a 5.
Allow the thinset to completely dry before you seal the.