Fire pump testing is complex and must be performed by qualified professionals.
Fire pump testing checklist.
The test should be performed by attaching hoses to the discharge test header.
Fire alarm main sub panel b.
All fire pump stop pressure fire pump shut off pressure minimum suction pressure.
Establish a program of regular inspection testing and maintenance to ensure your fire pump performs its critical function during a fire.
Weekly fire pump test form.
Annual fire pump flow test.
A separate checklist for electric pump and diesel pump is attached at the end of the document.
Smoke cut off switch in ahu e.
During pump operation record results for each weekly test in the appropriate column for all items listed.
Testing of automatic operation of fire pump.
Fire pump sprinkler ring main system f.
Leave the pump in automati c start mode after testing.
Exit directional sign test a.
Pressurisation staircase air velocity test i.
Impairments should be managed via a.
The fire pump flow test is required by nfpa 25 to be conducted once a year in order to measure the pump s flow and pressure.
To help ensure the fire or booster pump is working there needs to be periodic inspection maintenance and testing of the pump.
However nfpa 25 charges the property owner with maintaining complete written reports of fire pump test results 8 4.
The jockey pump start point should be at l east 0 68 bar 10 psi less than the jockey pump stop point.
If a need for repairs or adjustments is discovered during the weekly testing they should be made immediately following the.
Set pressure switches to the following setting valves.
Electric fire pump inspection checklist instructions.
Open system valve and turn all isolating valves to the fully open position.
The following information provides an overview of the requirements.
Test all fire pumps daily weekly.
The hoses are run to a safe location where the flow of water will cause no damage.
The fire pump start point should be 0 34 bar 5 psi less than the jockey pump start point.
Plot the pump curve and match it with the factory test curve.
All fire pumps should be run and tested weekly.
N mark the correct settings.
N provide flow test results.
Using the checklist attached below and consider the following.
At a minimum the report must include 8 4 1 1.
U se 0 68 bar 10 psi increments for each additional pump.
Diesel pump fire g.
Manual call points c.
An fm global engineer also can provide the characteristic curve for the annual flow test fm global form 105 pump acceptance test data.